Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online more than two weeks ago
Candidate
Male, 37 years, born on 27 January 1988
Moscow, willing to relocate (Moscow, Tomsk, Tyumen), prepared for business trips
Project engineer (Gas, Oil, Petrochemical, LNG, LN2, Liqiuid helium)
Specializations:
- Other
Employment: full time, project work
Work schedule: full day, flexible schedule
Work experience 10 years 4 months
November 2014 — June 2015
8 months
Scientific-Research Institiut of Oil and Gas" PETON
Ufa, peton.ru
Deputy Head of Process engineering Department
Deputy Head of Process engineering Department
- Acting as the head of department for the certain project direction, the deputy functions of project
manager. Project: Amur Gas Processing Plant (Natural gas to methane, ethane, C3+, helium, LNG, helium liquefaction. Customer - Gazprom).
- teamwork with the Licensor technology (Linde Engineering, Germany), discussion and
refinement of technology in accordance with the legislation of the Russian Federation
- Development and production of documentation stages: FEED, stage P.
- Issue of jobs and control of work related departments.
- Coordination of joint work with the office unit in Moscow (in particular the organization of the
translation and adaptation of foreign documentation in Russian).
- Lead of video conferencing (between Linde and Peton), technical meetings, simultaneous
translation (English to Russian / backward).
- The introduction of electronic document standards
- Analytical work (assessment of the prospects of helium extraction from the main pipeline.)
- Presentations,defence of technical solutions to the Customer.
October 2012 — November 2014
2 years 2 months
Cryogenic gas technologies, LTD
Saint Petersburg, cryogastech.ru
Process engineer (LNG, liquid helium, air separation, LN2)
A complete cycle of activities on the project "Helium liquefaction plant, Orenburg", OJSC
"Gazprom Gazenergoset" as a lead process engineer and deputy project manager (technical
part), including:
- Development of whole project “life-cycle” documentation, in accordance with the Russian
legislation, together with Linde Kryotechnick, Switherland;
- Work with suppliers of auxiliary process equipment, valves, analytical instruments
(questionnaires, data collection and analysis of technical-commercial proposals, assistance in
procurement);
- Preparation of tasks for the development of technical documentation related departments,
interaction, control;
- Ensuring interaction with the provider of key technologies, Linde Kryotechnick, Switzerland.
(regular business trips to the office of Pfungen, teamwork with experts and project manager, and
request the issuance of documentation for all departments, negotiation, settlement of disputes);
- Development of operational documentation (individual programs on the basis of documentation
Linde, in English);
- Direct participation in commissioning the facility for 100 days (business trips, with breaks in the
week), a teamwork with the chief engineers of Linde Kryotechnik, technical interpretation,
interaction with the contractors on site, training of employees of the operating organization, daily
reporting on progress works.
The object was launched 15.07.2014 (http://gazpromlpg.ru/index.php?id=31&news=353). The first
helium liquefaction plant, built and launched in Russia for the last 20 years.
Organization of technical cooperation and collaboration within the work on the project "Natural gas
liquefaction plant, Perm" supplier of technology, the company Cryotec, working together with
experts and project manager in the office, of Wurzen, Germany. Preparations for commissioning
works, development of production schedules. Periodic buisness trips to the construction site,
participation in training.
Development of project documentation for the project: "Nitrogen and compressod instrument air production unit". Customer: JSC "NIPIGazpererabotka", Sibur.
October 2008 — July 2012
3 years 10 months
"NPO "Lenkor-Engineering", JSC
Saint Petersburg
Process engineer
Completed projects:
"Nitrile rubber plant, 50,000 tons / year," Customer: Ning bo Shunze Rubber, China
"Isoprene rubber plant, 50,000 tons / year," Customer: Panjin Heyun, China
Activities on the project includes:
- Analysis of the technology, development of optimal technical
solutions that meet the requirements of the specifications for the design and
existing regulations;
- Development and implementation of process flow diagrams (PFD, P & ID), including the main
control loops, the selection of fixtures;
- Calculation and selection of the main and auxiliary
equipment (bulk, heat transfer, mass transfer,
dynamic), preparation of questionnaires;
- Teamwork with departments (design, construction,
civil eng. , automation ), preparation of specifications for the design,
expertise of documentation;
- The final release of the design documentation (BDEP), including
in English.
- Negotiations with the technical representatives of the customer,
third-part organizations, work with the commercial documentation,
analysis of the technical proposals.
- Acceptance of the detailed project documents of the company's developer (Qpec, China), the
analysis, the adjustment
- Interaction with NIISK them. Lebedev, St. Petersburg, Voronezh (technology licensors)
January 2005 — September 2008
3 years 9 months
"Presscom", LTD"
Saint Petersburg, allinform.ru
Sales manager
Negotiations with customers, presentations, preparation of business proposals, making deals.
Skills
Skill proficiency levels
About me
Sport: gym, hockey, swimming pool.
Music: classic as well as modern.
Traveling.
Higher education
2013
St. Petersburg State Technological Institute (technical university)
Industrial safety, Postgraduate education
2010
Fine chemicals and polymer materials, rational use of material and energy resources (energy efficiency in the petrochemical industry)
Languages
Citizenship, travel time to work
Citizenship: Russia
Permission to work: Russia
Desired travel time to work: Doesn't matter